The Network Science and Engineering Council (NetSE), GENI Project Office (GPO) and the National Science Foundation (NSF) have all agreed to the roles in this document. This is a living document that will be updated from time to time. Please send comments or suggestions to geni-input.
NSF is a partner to both organizations and has oversight roles and responsibilities.
Organization |
Roles |
Responsibilities |
| |
NetSE Council |
- Definitive source of “what we need in GENI”
- Technical advisory and review role to GPO
- Home for the Architecture Review Board (ARB)
- CS community builder
- Principal spokespeople / luminaries for GENI
- Home for international collaboration and federation policy aspects of GENI, other than governmental
|
- Develop and maintain Research and Education Plan
- Develop and maintain End-to-End use cases/scenarios document
- Build and strengthen the community since outreach is a key to GENI’s success; be the principal spokespeople / luminaries for GENI
- Provide 3-5 candidates and support GPO hiring for Engineering Architect
- Review and provide feedback, within 10 days, on architecture document, requirements document & Sub-system design documents with each release
- Review facility working group documents at each 3-month for readiness review
- Review Change Control Board (CCB) methodology
- Participate and provide feedback in pre-CDR, PDR and FDR reviews
- Help prioritize risks and participate in risk mitigation prototyping proposal review and selection process
- Support GPO on specific policy issues, i.e. Intellectual Property (IP)
- Guide GPO in advance of major decisions
|
GPO |
- Project management and execution
- GENI architecture and system engineering
- Cost and schedule estimates for construction
- Legal and contractual management, including IP
- Management of risk reduction process (prototyping etc.)
- Outreach and broader social impact for under-represented groups & industry
|
- Support the NetSE Council in prioritization of experiment requirements
- Create a GENI facility construction plan that is credible, with high assurance on schedule & budget
- Pass MREFC Planning Phase process with flying colors:
Plan, design and prepare CDR and associated documents
Plan, design and prepare PDR and associated documents
Plan, design and prepare FDR and associated documents
- Create and maintain architecture document, requirements document, & Sub-system system design documents
- Organize and manage Facility Working Groups, under direction of the Engineering Architect
- Create and execute risk reduction plan (prototyping efforts) by working with NSF, research community and industry.
- Create and maintain an Outreach Plan
- Support the NetSE Council and NSF in community building.
- Support the NetSE Council as spokespeople
- Ensure openness and fairness in selection of prototyping and risk reduction activities
- Provide transparency and open access into the GENI facility and its design during the planning and construction phases
|
|